Sponsored Links

Interview Questions



Advertisements Software Quality Assurance Certification Interview Questions
COOLINTERVIEW.COM CERTIFICATION EXAMS INTERVIEW QUESTIONS SOFTWARE QUALITY ASSURANCE CERTIFICATION INTERVIEW QUESTIONS QUESTIONS LISTING

Software Quality Assurance Certification Interview Questions & Answers

Below we have listed all the Software Quality Assurance Certification Interview Questions and answers. Feel free to comment on any Software Quality Assurance Certification Interview Questions or answer by the comment feature available on the page.

To buy an eBook containing 30,000 Interview Questions, with Answers, Click Here.
View All Software Quality Assurance Certification Interview Questions & Answers - Exam Mode / Learning Mode

Software Quality Assurance Certification Interview Questions & Answers

Certified Software Quality Analyst: (CSQA) Acquiring the designation of Certified Software Quality Analyst (CSQA) indicates a professional level of competence in the principles and practices of quality assurance in the IT profession. The highest level of certification offered through QAI Global Institute is the Certified Manager of Software Quality (CMSQ) designation, which tests your managerial capabilities and competencies in software quality assurance.

Previous 1 2

Sort By : Latest First | Oldest First | By Rating

Question
Rating
View Answer
An incident logging system

a only records defects
b is of limited value
c is a valuable source of project information during testing if it contains all incidents
d. should be used only by the test team.
0.3 Rating
View Answer
Testware(test cases, test dataset)

a. needs configuration management just like requirements, design and code
b. should be newly constructed for each new version of the software
c. is needed only until the software is released into production or use
d. does not need to be documented and commented, as it does not form part of the released
software system
0.2 Rating
View Answer
A test design technique is

a. a process for selecting test cases
b. a process for determining expected outputs
c. a way to measure the quality of software
d. a way to measure in a test plan what has to be done
0.2 Rating
View Answer
Which is not true-The black box tester

a. should be able to understand a functional specification or requirements document
b. should be able to understand the source code.
c. is highly motivated to find faults
d. is creative to find the system’s weaknesses
0.3 Rating
View Answer
The later in the development life cycle a fault is discovered, the more expensive it is to fix. why?

a. the documentation is poor, so it takes longer to find out what the software is doing.
b. wages are rising
c. the fault has been built into more documentation,code,tests, etc
d. none of the above
0.3 Rating
View Answer
In which order should tests be run?

a. the most important tests first
b. the most difficult tests first(to allow maximum time for fixing)
c. the easiest tests first(to give initial confidence)
d. the order they are thought of
0.2 Rating
View Answer
When reporting faults found to developers, testers should be:

a. as polite, constructive and helpful as possible
b. firm about insisting that a bug is not a “feature” if it should be fixed
c. diplomatic, sensitive to the way they may react to criticism
d. All of the above
0.3 Rating
View Answer
which of the following statements is not true

a. performance testing can be done during unit testing as well as during the testing of whole system
b. The acceptance test does not necessarily include a regression test
c. Verification activities should not involve testers (reviews, inspections etc)
d. Test environments should be as similar to production environments as possible
0.2 Rating
View Answer
What is the main reason for testing software before releasing it?

a. to show that system will work after release
b. to decide when the software is of sufficient quality to release
c. to find as many bugs as possible before release
d. to give information for a risk based decision about release
0.3 Rating
View Answer
Faults found by users are due to:

a. Poor quality software
b. Poor software and poor testing
c. bad luck
d. insufficient time for testing
0.4 Rating
View Answer
Software testing activities should start

a. as soon as the code is written
b. during the design stage
c. when the requirements have been formally documented
d. as soon as possible in the development life cycle
0.3 Rating
View Answer
IF YOU HAVE BEEN GIVEN THE RESPONSIBILITY TO ELICIT REQUIREMENTS FROM A CUSTOMER WHO TELL YOU HE IS TOO BUSY TO MEET WITH YOU. WHAT SHOULD YOU DO ?
0.3 Rating
View Answer
What is Basis Path Testing?
0.2 Rating
View Answer
What is Ad Hoc Testing?
0.3 Rating
View Answer
What is Agile Testing?
0.3 Rating
View Answer
What is Accessibility Testing?
0.3 Rating
View Answer
What is Acceptance Testing?
0.2 Rating
View Answer

Previous 1 2




User Options
India News Network

Latest 20 Questions
Payment of time- barred debt is: (a) Valid (b) Void (c) Illegal (d) Voidable
Consideration is defined in the Indian Contract Act,1872 in: (a) Section 2(f) (b) Section 2(e) (c) Section 2(g) (d) Section 2(d)
Which of the following is not an exception to the rule, "No consideration, No contract": (a) Natural love and affection (b) Compensation for involuntary services (c) Completed gift (d) Agency
Consideration must move at the desire of: (a) The promisor (b) The promisee (c) The promisor or any other party (d) Both the promisor and the promisee
An offer which is open for acceptance over a period of time is: (a) Cross Offer (b) Counter Offer (c) Standing Offer (d) Implied Offer
Specific offer can be communicated to__________ (a) All the parties of contract (b) General public in universe (c) Specific person (d) None of the above
_________ amounts to rejection of the original offer. (a) Cross offer (b) Special offer (c) Standing offer (d) Counter offer
A advertises to sell his old car by advertising in a newspaper. This offer is caleed: (a) General Offer (b) Special Offer (c) Continuing Offer (d) None of the above
In case a counter offer is made, the original offer stands: (a) Rejected (b) Accepted automatically (c) Accepted subject to certain modifications and variations (d) None of the above
In case of unenforceable contract having some technical defect, parties (a) Can sue upon it (b) Cannot sue upon it (c) Should consider it to be illegal (d) None of the above
If entire specified goods is perished before entering into contract of sale, the contract is (a) Valid (b) Void (c) Voidable (d) Cancelled
______________ contracts are also caled contracts with executed consideration. (a) Unilateral (b) Completed (c) Bilateral (d) Executory
A offers B to supply books @ Rs 100 each but B accepts the same with condition of 10% discount. This is a case of (a) Counter Offer (b) Cross Offer (c) Specific Offer (d) General Offer
_____________ is a game of chance. (a) Conditional Contract (b) Contingent Contract (c) Wagering Contract (d) Quasi Contract
There is no binding contract in case of _______ as one's offer cannot be constructed as acceptance (a) Cross Offer (b) Standing Offer (c) Counter Offer (d) Special Offer
An offer is made with an intention to have negotiation from other party. This type of offer is: (a) Invitation to offer (b) Valid offer (c) Voidable (d) None of the above
When an offer is made to the world at large, it is ____________ offer. (a) Counter (b) Special (c) General (d) None of the above
Implied contract even if not in writing or express words is perfectly _______________ if all the conditions are satisfied:- (a) Void (b) Voidable (c) Valid (d) Illegal
A specific offer can be accepted by ___________. (a) Any person (b) Any friend to offeror (c) The person to whom it is made (d) Any friend of offeree
An agreement toput a fire on a person's car is a ______: (a) Legal (b) Voidable (c) Valid (d) Illegal



Fresher Jobs | Experienced Jobs | Government Jobs | Walkin Jobs | Company Profiles | Interview Questions | Placement Papers | Companies In India | Consultants In India | Colleges In India | Exams In India | Latest Results | Notifications In India | Call Centers In India | Training Institutes In India | Job Communities In India | Courses In India | Jobs by Keyskills | Jobs by Functional Areas

Testing Articles | Testing Books | Testing Certifications | Testing FAQs | Testing Downloads | Testing Interview Questions | Testing Jobs | Testing Training Institutes

Gate Articles | Gate Books | Gate Colleges | Gate Downloads | Gate Faqs | Gate Jobs | Gate News | Gate Sample Papers | Gate Training Institutes

MBA Articles | MBA Books | MBA Case Studies | MBA Business Schools | MBA Current Affairs | MBA Downloads | MBA Events | MBA Notifications | MBA FAQs | MBA Jobs
MBA Job Consultants | MBA News | MBA Results | MBA Courses | MBA Sample Papers | MBA Interview Questions | MBA Training Institutes

GRE Articles | GRE Books | GRE Colleges | GRE Downloads | GRE Events | GRE FAQs | GRE News | GRE Training Institutes | GRE Sample Papers

IAS Articles | IAS Books | IAS Current Affairs | IAS Downloads | IAS Events | IAS FAQs | IAS News | IAS Notifications | IAS UPSC Jobs | IAS Previous Question Papers
IAS Results | IAS Sample Papers | IAS Interview Questions | IAS Training Institutes | IAS Toppers Interview

SAP Articles | SAP Books | SAP Certifications | SAP Companies | SAP Study Materials | SAP Events | SAP FAQs | SAP Jobs | SAP Job Consultants
SAP Links | SAP News | SAP Sample Papers | SAP Interview Questions | SAP Training Institutes |




Copyright ©2003-2024 CoolInterview.com, All Rights Reserved.
Privacy Policy | Terms and Conditions