CoolInterview.com - World's Largest Collection of Interview Questions & Answers, FAQs, queries, sample papers, exam papers, dumps, what, why, how, where, when questions
Our Services
Get 9,000 Interview Questions & Answers in an eBook.




Get it now !!
Send your Resume to 6000 Companies

Search Interview Questions

Question: Can you explain water fall model in manual testing?

Answer: Waterfall Model is one type of SDLC (Software Development Lifecycle) model. This is also referred to as a linear-sequential life cycle model. It is very simple to understand and use. In a waterfall model, each phase must be completed in its entirety before the next phase can begin. At the end of each phase, a review takes place to determine if the project is on the right path and whether or not to continue or discard the project.
1. Requirements analysis
2. High level system design
3. Low level system design
4. Coding
5. Unit and integration testing
6. System testing
7. Acceptance testing
8. Operation and maintenance



Category Testing Interview Questions & Answers - Exam Mode / Learning Mode
Rating (0.3) By 6711 users
Added on 6/9/2013
Views 54239
Rate it!
Question: Can you explain water fall model in manual testing?
Answer:

Waterfall Model is one type of SDLC (Software Development Lifecycle) model. This is also referred to as a linear-sequential life cycle model. It is very simple to understand and use. In a waterfall model, each phase must be completed in its entirety before the next phase can begin. At the end of each phase, a review takes place to determine if the project is on the right path and whether or not to continue or discard the project.
1. Requirements analysis
2. High level system design
3. Low level system design
4. Coding
5. Unit and integration testing
6. System testing
7. Acceptance testing
8. Operation and maintenance Source: CoolInterview.com

Answered by: sridevi challa | Date: 6/17/2008 | Contact sridevi challa Contact sridevi challa

It is a linear sequential model
It is very simple model to implement
It is the first model.
It needs very few resources to implement

In this model there is no back tracking.
For example if any error occurred an any
stage of software development,it can't be
corrected in that build.
Source: CoolInterview.com

Answered by: Jeevan Bikash Mishra | Date: 6/17/2008 | Contact Jeevan Bikash Mishra Contact Jeevan Bikash Mishra

Waterfall approach was first Process Model to be introduced and followed widely in Software Engineering to ensure success of the project. In "The Waterfall" approach, the whole process of software development is divided into separate process phases.
The phases in Waterfall model are: Requirement Specifications phase, Software Design, Implementation and Testing & Maintenance. All these phases are cascaded to each other so that second phase is started as and when defined set of goals are achieved for first phase and it is signed off, so the name "Waterfall Model". All the methods and processes undertaken in Waterfall Model are more visible.
Waterfall Model


The stages of "The Waterfall Model" are:

Requirement Analysis & Definition: All possible requirements of the system to be developed are captured in this phase. Requirements are set of functionalities and constraints that the end-user (who will be using the system) expects from the system. The requirements are gathered from the end-user by consultation, these requirements are analyzed for their validity and the possibility of incorporating the requirements in the system to be development is also studied. Finally, a Requirement Specification document is created which serves the purpose of guideline for the next phase of the model.
System & Software Design: Before a starting for actual coding, it is highly important to understand what we are going to create and what it should look like? The requirement specifications from first phase are studied in this phase and system design is prepared. System Design helps in specifying hardware and system requirements and also helps in defining overall system architecture. The system design specifications serve as input for the next phase of the model.
Implementation & Unit Testing: On receiving system design documents, the work is divided in modules/units and actual coding is started. The system is first developed in small programs called units, which are integrated in the next phase. Each unit is developed and tested for its functionality; this is referred to as Unit Testing. Unit testing mainly verifies if the modules/units meet their specifications.
Integration & System Testing: As specified above, the system is first divided in units which are developed and tested for their functionalities. These units are integrated into a complete system during Integration phase and tested to check if all modules/units coordinate between each other and the system as a whole behaves as per the specifications. After successfully testing the software, it is delivered to the customer.
Operations & Maintenance: This phase of "The Waterfall Model" is virtually never ending phase (Very long). Generally, problems with the system developed (which are not found during the development life cycle) come up after its practical use starts, so the issues related to the system are solved after deployment of the system. Not all the problems come in picture directly but they arise time to time and needs to be solved; hence this process is referred as Maintenance.
Source: CoolInterview.com

Answered by: shaveta | Date: 7/3/2009 | Contact shaveta Contact shaveta


If you have the better answer, then send it to us. We will display your answer after the approval

Rules to Post Answers in CoolInterview.com:-

  • There should not be any Spelling Mistakes.
  • There should not be any Gramatical Errors.
  • Answers must not contain any bad words.
  • Answers should not be the repeat of same answer, already approved.
  • Answer should be complete in itself.

Post your answer here

Inform me about updated answers to this question.
Related Questions
View Answer
Can you explain V model in manual testing?
View Answer
can u explain spiral binding model in manual testing
View Answer
What is SRS and BRS document?Can you explain them briefly.
View Answer
Explain me the phases of STLC and explain each one briefly?
View Answer
What is fish model can you explain?
View Answer
What is unit testing in manual?
View Answer
What is test development?
View Answer
What is port testing?
View Answer
What is V model can u explain ?
View Answer
What is BUG Life cycle?
View Answer
What is system testing?
View Answer
What is SRS and BRS in manual testing.
View Answer
What is test metrics ?
View Answer
What is test strategy who will prepare that one. And what will be there in test strategy.
View Answer
What is a test plan who will prepare that one?
View Answer
What is STLC? How many phases are there can you explain them?
View Answer
What is V model in manual testing ?
View Answer
What is the model of spiral binding in manual testing? Can you explain spiral binding?
View Answer

Please Note: We keep on updating better answers to this site. In case you are looking for Jobs, Pls Click Here Vyoms.com - Best Freshers & Experienced Jobs Website.

View All Testing Interview Questions & Answers - Exam Mode / Learning Mode




India News Network
Latest 20 Questions
Payment of time- barred debt is: (a) Valid (b) Void (c) Illegal (d) Voidable
Consideration is defined in the Indian Contract Act,1872 in: (a) Section 2(f) (b) Section 2(e) (c) Section 2(g) (d) Section 2(d)
Which of the following is not an exception to the rule, "No consideration, No contract": (a) Natural love and affection (b) Compensation for involuntary services (c) Completed gift (d) Agency
Consideration must move at the desire of: (a) The promisor (b) The promisee (c) The promisor or any other party (d) Both the promisor and the promisee
An offer which is open for acceptance over a period of time is: (a) Cross Offer (b) Counter Offer (c) Standing Offer (d) Implied Offer
Specific offer can be communicated to__________ (a) All the parties of contract (b) General public in universe (c) Specific person (d) None of the above
_________ amounts to rejection of the original offer. (a) Cross offer (b) Special offer (c) Standing offer (d) Counter offer
A advertises to sell his old car by advertising in a newspaper. This offer is caleed: (a) General Offer (b) Special Offer (c) Continuing Offer (d) None of the above
In case a counter offer is made, the original offer stands: (a) Rejected (b) Accepted automatically (c) Accepted subject to certain modifications and variations (d) None of the above
In case of unenforceable contract having some technical defect, parties (a) Can sue upon it (b) Cannot sue upon it (c) Should consider it to be illegal (d) None of the above
If entire specified goods is perished before entering into contract of sale, the contract is (a) Valid (b) Void (c) Voidable (d) Cancelled
______________ contracts are also caled contracts with executed consideration. (a) Unilateral (b) Completed (c) Bilateral (d) Executory
A offers B to supply books @ Rs 100 each but B accepts the same with condition of 10% discount. This is a case of (a) Counter Offer (b) Cross Offer (c) Specific Offer (d) General Offer
_____________ is a game of chance. (a) Conditional Contract (b) Contingent Contract (c) Wagering Contract (d) Quasi Contract
There is no binding contract in case of _______ as one's offer cannot be constructed as acceptance (a) Cross Offer (b) Standing Offer (c) Counter Offer (d) Special Offer
An offer is made with an intention to have negotiation from other party. This type of offer is: (a) Invitation to offer (b) Valid offer (c) Voidable (d) None of the above
When an offer is made to the world at large, it is ____________ offer. (a) Counter (b) Special (c) General (d) None of the above
Implied contract even if not in writing or express words is perfectly _______________ if all the conditions are satisfied:- (a) Void (b) Voidable (c) Valid (d) Illegal
A specific offer can be accepted by ___________. (a) Any person (b) Any friend to offeror (c) The person to whom it is made (d) Any friend of offeree
An agreement toput a fire on a person's car is a ______: (a) Legal (b) Voidable (c) Valid (d) Illegal
Cache = 0.027344 Seconds