    Question :
    Explain Software Development Life Cycle Model?
    Category Software Development Life Cycle Interview Questions
    Rating (0.4) By 1332 users
    Added on 3/31/2008
    Views 2314
    Rate it!
    Answers:

    Methods

    Life cycle models describes the inter-relationships between software development phases.

    The common life cycle models are:

    * Waterfall Model
    * Spiral Model
    * V-Model
    * Prototyping Model
    * Evolutionary Development Model
    * Reusable Software Model
    * Synchronize and Stabilize Model

    Since the life cycle steps are described in general terms, the models are adaptable and their implementation details will vary among different organizations. The spiral model is the most general. Most life cycle models can infact be derived as special instances of the spiral model. Organizations may mix and match different life cycle models to develop a model more tailored to their products and capabilities.

    Waterfall Model

    This is also known as Classic Life Cycle Model (or) Linear Sequential Model (or) Waterfall Method. This has the following features:

    * It is least flexible and most obsolete of the life cycle models.
    * It is well suited to projects that has low risk in the areas of user interface and performance requirements, but high risk in budget and schedule predictability and control.

    Stages involved in Software development process:
    1. System Engineering and Modeling
    2. Software Requirements Analysis
    3. Systems Analysis and Design
    4. Code Generation
    5. Unit Testing
    6. Integration Testing
    7. System Testing
    8. Operation
    9. Maintenance

    The waterfall model derives its name due to the cascading effect from one phase to the other as is illustrated in the Figure. In this model each phase has a well defined starting and ending point, with identifiable deliveries to the next phase.


    System/Information Engineering

    As software is always of a large system (or business), work begins by establishing requirements for all system elements and then allocating some subset of these requirements to software. This system view is essential when software must interface with other elements such as hardware, people and other resources. System is the basic and very critical requirement for the existence of software in any entity. So if the system is not in place, the system should be engineered and put in place. In some cases, to extract the maximum output, the system should be re-engineered and spruced up. Once the ideal system is engineered or tuned, the development team studies the software requirement for the system.

    Feasibility:
    Defining a preferred concept for the software product and determining its life-cycle feasibility and superiority to alternative concepts.

    Requirements:
    A complete, verified specification of the required functions, interfaces, and performance for the software product.

    Product Design:

    A complete verified specification of the overall hardware-software architecture, control structure, and data structure for the product, along with such other necessary components as draft user's manuals and test plans.

    Detailed Design:

    A complete verified specification of the control structure, data structure, interface relations, sizing, key algorithms and assumptions of each program component.

    Coding:
    A complete, verified set of program components. A proper functional software product composed of the software components.

    Implementation:

    A fully functioning operational hardware-software system, including such objectives as program and data conversion, installation and training.

    Maintenance:

    A fully functioning update of the hardware-software system repeated for each update.

    Phaseout:

    A clean transition of the functions performed by the product to its successors.

    Advantages

    * Testing is inherent to every phase of the waterfall model
    * It is an enforced disciplined approach
    * It is documentation driven, that is, documentation is produced at every stage

    Disadvantages

    * It only incorporates iteration indirectly, thus changes may cause considerable confusion as the project progresses.
    * As the client usually has a vague idea of exactly what is required from the software product, the Waterfall Model has difficulty accommodating the natural uncertainty that exists at the beginning of the project.
    * The customer only sees a working version of the product after it has been coded which may result in disaster. Any undetected problems are precipitated to this stage.

    Strengths and Weakness of different Software Development Life Cycle Models:

    Waterfall Model:
    waterfall performs well for products with clearly understood requirements or when working with well understood technical tools, architectures and infrastructures. It's weaknesses frequently make it inadvisable when rapid development is needed. In those cases, modified models may be more effective.

    Strengths

    * Minimizes planning overhead since it can be done up front.
    * Structure minimizes wasted effort, so it works well for technically weak or inexperienced staff.

    Weaknesses

    * Inflexible.
    * Only the final phase produces a non-documentation deliverable.
    * Backing up to address mistakes is difficult

    Spiral Model
    The spiral is a risk-reduction oriented model that breaks a software project up into mini-projects, each addressing one or more major risks. After major risks have been addressed, the spiral model terminates as a waterfall model.

    Strengths

    * Early iterations of the project are the cheapest, enabling the highest risks to be addressed at the lowest total cost. This ensures that as costs increase, risks decrease.
    * Each iteration of the spiral can be tailored to suit the needs of the project.

    Weaknesses

    * It is complicated and requires attentive and knowledgeable management to pull it off.

    Prototype Models:

    Prototyping uses multiple iterations of requirements gathering and analysis, design and prototype development. After each iteration, the result is analyzed by the customer. Their response creates the next level of requirements and defines the next iteration.

    Strengths

    * Customers can see steady progress.
    * This is useful when requirements are changing rapidly, when the customer is reluctant to commit to a set of requirements or when no one fully understands the application area.

    Weaknesses

    * It is impossible to know at the outset of the project how long it will take.
    * There is no way to know the number of iterations that will be required.

    Code-and-Fix

    If you don't use a methodology, it's likely you are doing code-and-fix. Code-and-fix rarely produces useful results. It is very dangerous as there is no way to assess progress, quality or risk. Code-and-fix is only appropriate for small throwaway projects like proof-of-concept, short-lived demos or throwaway prototypes.

    Strengths

    * No time spent on "overhead" like planning, documentation, quality assurance, standards enforcement or other non-coding activities.
    * Requires little experience.

    Weaknesses

    * Dangerous.
    * No means of assessing quality or identifying risks.
    * Fundamental flaws in approach do not show up quickly, often requiring work to be thrown out.



    If you have the better answer, then send it to us. We will display your answer after the approval.
    Rules to Post Answers in CoolInterview.com:-

  • There should not be any Spelling Mistakes.
  • There should not be any Gramatical Errors.
  • Answers must not contain any bad words.
  • Answers should not be the repeat of same answer, already approved.
  • Answer should be complete in itself.
  • Name :*
    Email Id :*
    Answer :*
    Verification Code Code Image - Please contact webmaster if you have problems seeing this image code Not readable? Load New Code
    Process Verification  Enter the above shown code:*
    Inform me about updated answers to this question

       
    Related Questions
    View Answer
    what is the difference between system development life cycle & software development life cyle(sdlc) what is system development life cycle
    View Answer
    What do you mean by Security in the software development life cycle?
    View Answer
    Why is software development life cycle is important for the development of software?
    View Answer
    Why is software development life cycle is important for the development of software?
    View Answer
    What are the Stages of the software development life cycle?
    View Answer
    What are the Different Software Development Model?
    View Answer
    What is software development Life Cycle (SDLC)? where exactly the Testing activity begin in SDLC?
    View Answer
    Explain SDLC?
    View Answer
    What is Diff. between STLC and SDLC?
    View Answer


    Please Note: We keep on updating better answers to this site. In case you are looking for Jobs, Pls Click Here Vyoms.com - Best Freshers & Experienced Jobs Website.

    View ALL Software Development Life Cycle Interview Questions

    User Options
    Sponsored Links


    Copyright ©2003-2014 CoolInterview.com, All Rights Reserved.
    Privacy Policy | Terms and Conditions

    Download Yahoo Messenger | Placement Papers| FREE SMS | ASP .Net Tutorial | Web Hosting | Dedicated Servers | C Interview Questions & Answers

    Testing Articles | Testing Books | Testing Certifications | Testing FAQs | Testing Downloads | Testing Interview Questions | Testing Jobs | Testing Training Institutes


    Cache = 0.029297 Seconds